Natural Gas Coming to Rivers Edge

We have enough signatures for PSNC to move ahead and install natural gas distribution to our community.  In speaking with our PSNC rep, the schedule is to start in May of 2018.  He did mention that there is a DOT permit that has to be issued that could cause a delay, but he was very confident we would have installation this summer.  This is a construction project so there are variables such as weather and permitting.

Leave a Reply

Skip to toolbar